VOICE OF VIETNAM (BROADCASTING TECHNICAL CENTER)
Antenna mast 135m at VOV Quang Binh Antenna mast 135m at VOV Quang Binh Bidding Package: Survey consultancy and design of the construction of a
Antenna mast 135m at VOV Quang Binh Antenna mast 135m at VOV Quang Binh Bidding Package: Survey consultancy and design of the construction of a
Image of self-supporting tower in Chuong Duong Image of guyed mast tower on the roof – Van La Image of guyed mast tower in Yen
Image of guyed mast tower in Dai Tien-Cao Bang Image of guyed mast tower in Hoa An 3-Cao Bang Bidding Package: Antenna Mast Inspection Construction:
Antenna mast in Hai Yen Commune – Lang Son Antenna mast in Thuy Hung Commune – Lang Son Antenna mast in Hoa Binh Commune –
Guyed mast tower in Ta-LanhII_ DBN Guyed mast tower in Ta-LanhII_ DBN Guyed mast tower in Ta-LanhII_ DBN Guyed mast tower in Ta-LanhII_ DBN Guyed
75.2m antenna mast in Truyen Hinh Hill, Quang Ninh 75.2m antenna mast in Truyen Hinh Hill, Quang Ninh 85.2m antenna mast in Doi Con Oc
Antenna mast in Doi Quyet Thang – Thanh Hoa, H=115m Antenna mast in Ha Tien city – Thanh Hoa, H=125m Antenna mast in Phan Thiet
3D image of 135m antenna mast in Savanakhet (Laos) Actual image of 135m antenna mast in Savanakhet (Laos) Self-supporting tower 135m high (Savanakhet – Lao
National Broadcasting Station on the top of Chieu Lau Thi Mountain National Broadcasting Station on the top of Chieu Lau Thi Mountain National Broadcasting Station
Self-supporting tower H=150M at Bac Giang radio and television broadcasting Bidding Package: QUALITY CONTROL OF ANTENNA MASTS Construction: Quality inspection of self-supporting tower mast H=150M
Bidding Package: Consultancy Equipment installation supervision Construction: Construct and install antenna masts and Broadcast Transmission Technical Center under Hanoi Radio and Television Broadcasting Location: Hanoi
No. | CÔNG TRÌNH | OWNER |
I | Construction Surveying Consulting, Economic-Technical report preparation | |
1 | Survey, design construction drawings and budget statement for project : “Investment in the construction of AM/DRM medium wave radio system in broadcast stations in Central region, to increse coverage capacity in Paracel islands and maritime zones of Vietnam.(2022) | Broadcasting Technology Center– VOV |
2 | Consult construction surveying, prepare Economic-Technical report for project “Repair and maintain TV antenna towers in Phu Yen” (2022). | Broadcast transmission technical center – VTV |
3 | Survey, design construction drawing and budget statement for Broadcasting station in Tay Nguyen – project ” Upgrade AM power capacity in Tay Nguyen and upgrade, move broadcast station in Ba Den mountain – Tay Ninh, Phia Oắc Broadcast station – Cao Bang” (2021). | Broadcasting Technology Center– VOV |
4 | Consult construction surveying, design construction drawings, prepare budget statement for 135m antenna mast of project” Radio and Television Broadcast in Savanakheet, Lao PDR”(2016) | Radio Project Management Board in Lao People’s Democratic Republic and Kingdom of Cambodia |
5 | Survey, technically design and prepare budget statement for construction of project ” Investment in television broadcasting antenna tower in Nam Dinh ( 160m antenna tower – 2014) | Broadcast transmission technical center – VTV |
II | Inspecting | |
1 | Survey, set up maintenance and inspection procedures for TV antenna tower of Technical Center for Broadcasting in 2022 (12 antenna tower) | Broadcast transmission technical center – VTV |
2 | Survey, set up maintenance and inspection procedures for TV antenna tower of Technical Center for Broadcasting in 2021 (19 antenna tower) | Broadcast transmission technical center – VTV |
3 | Verify BTS antenna mast at telecommunication centers in 2022 (176 column) | Ha Noi Telecommunications |
4 | Verify 165m self-supporting antenna tower – Department H47 – General Department IV – Ministry of Public Security | The General Department of Logistics and Engineering – Ministry of Public Security |
5 | Verify and maintain 252m column broadcast at Broadcast transmission center, Ha Noi Radio and Television Broadcasting (2016) | HANOI RADIO AND TELEVISION BROADCASTING |
6 | Verify 252m anten tower Binh Duong Radio and Television Broadcasting | Binh Duong Radio and Television Broadcasting |
III | Supervising | |
1 | Equipment installation supervision in 2023 at Broadcast station in Central region – project: ” Investment in the construction of AM/DRM medium wave radio system in broadcast stations in Central region, to increse coverage capacity in Paracel islands and maritime zones of Vietnam.(2022) | Broadcasting Technology Center– VOV |
2 | Giám sát thực hiện gói thầu: “Mua sắm, lắp đặt hệ thống thiết bị tăng cường năng lực và mở rộng vùng phủ sóng phát thanh FM tại Cà Mau, Phú Quốc, Tây Nguyên, Nha Trang, Sơn La, Cần Thơ, Đà Nẵng thuộc Dự án: “Tăng cường năng lực và mở rộng vùng phủ sóng phát thanh FM hệ VOV1, VOV2, VOV3 trên phạm vi toàn quốc (Năm 2021). | Broadcasting Technology Center– VOV |
3 | Supervise construction and equipment installation for project: Investment in the construction of broadcast stations in South Central region, to increse coverage capacity in Paracel islands and Spratly Islands of Vietnam.(2020) | Broadcasting Technology Center– VOV |
4 | Supervise construction and equipment supply – installation for project “Radio and Television Broadcast in Xaisomboun Province, Lao PDR” (2020) | Project Management Board in Lao People’s Democratic Republic and Kingdom of Cambodia |
5 | Supervise construction and equipment supply – installation for project” Radio and Television Broadcast in Savanakheet, Lao PDR” (2017) | Project Management Board in Lao People’s Democratic Republic and Kingdom of Cambodia |
IV | Prepare Feasibility study report | |
1 | Prepare Feasibility study report for project: “Building a news production and processing center according to new technology of the Voice of Vietnam” (2022). | Program production and storage center |
2 | Prepare Feasibility study report for project: “Upgrade AM power capacity in Tay Nguyen and upgrade, move broadcast station in Ba Den mountain – Tay Ninh, Phia Oắc Broadcast station – Cao Bang” (2021) | Broadcasting Technology Center– VOV |
3 | Prepare Feasibility study report for project: Investment in the construction of AM/DRM medium wave radio system in broadcast stations in Central region, to increse coverage capacity in Paracel islands and maritime zones of Vietnam.(2021) | Broadcasting Technology Center– VOV |
V | Geological Drilling | |
1 | Geological survey drilling for erection of antenna tower <50m in Phu Yen (2022). | Broadcast transmission technical center – VTV |
2 | Geological survey drilling – project: Upgrade AM power capacity in Tay Nguyen and upgrade, move broadcast station in Ba Den mountain – Tay Ninh, Phia Oắc Broadcast station – Cao Bang” (2021) | Broadcasting Technology Center– VOV |
3 | Geological survey drilling – project: Investment in the construction of AM/DRM medium wave radio system in broadcast stations in Central region, to increse coverage capacity in Paracel islands and maritime zones of Vietnam.(2021) | Broadcasting Technology Center– VOV |
PCC © Copyright 2022 - All rights reserved.